Current and future facility instruments at the Gemini Observatory

Date

2008

Authors

Jensen, Joseph B
Kleinman, Scot J
Simons, Douglas A
Lazo, Manuel
Rigaut, Francois
White, John K

Journal Title

Journal ISSN

Volume Title

Publisher

SPIE - The International Society for Optical Engineering

Abstract

At the present time, several new Gemini instruments are being delivered and commissioned. The Near-Infrared Coronagraph has been extensively tested and commissioned on the Gemini-South telescope, and will soon begin a large survey to discover extrasolar planets. The FLAMINGOS-2 near-IR multi-object spectrograph is nearing completion at the University of Florida, and is expected to be delivered to Gemini-South by the end of 2008. Gemini's Multi-Conjugate Adaptive Optics bench has been successfully integrated and tested in the lab, and now awaits integration with the laser system and the Gemini-South AO Imager on the telescope. We also describe our efforts to repair thermal damage to the Gemini Near-IR Spectrograph that occurred last year. Since the last update, progress has been made on several of Gemini's next generation of ambitious "Aspen" instruments. The Gemini Planet Imager is now in the final design phase, and construction is scheduled to begin shortly. Two competitive conceptual design studies for the Wide-Field Fiber Multi-Object Spectrometer have now started. The Mauna Kea ground layer monitoring campaign has collected data for well over a year in support of the planning process for a future Ground Layer Adaptive Optics system.

Description

Keywords

Keywords: Design phase; Extra solar planets; Ground layer; Ground-layer adaptive optics; Infrared; Instrumentation; Laser systems; Multi-object spectrograph; Multiconjugate adaptive optics; Multiobject; Near Infrared; Near-IR; Optical; Planning process; Thermal dam Cryogenic; Detectors; Infrared; Instrumentation; Optical

Citation

Source

Ground-Based and Airborne Instrumentation for Astronomy II

Type

Conference paper

Book Title

Entity type

Access Statement

License Rights

Restricted until

2037-12-31